Project Information

Our company has installed Building Management Systems (BMS) at the Vermio Extra High Voltage Substation (EHV) and at a High Voltage Substation (HV) in the wider area of Perdikkas, Eordaia.

At the Vermio EHV Substation, the system encompasses the automation and control of multi-speed ventilation fans, heating units, and the continuous monitoring of environmental conditions across critical operational and technical areas of the facility.

Equivalent functions were implemented at the Perdikkas High Voltage Substation, with the goal of ensuring reliable monitoring and control of operating conditions in selected electromechanical spaces.

At both installations, the BMS provides centralized real-time supervision through dedicated PCs and displays, enabling alarm management and historical data logging — ensuring optimal operating conditions and protecting equipment from adverse environmental factors.

The solutions were designed with a strong emphasis on reliability and the uninterrupted operation of energy infrastructure.

  • Client Parcon
  • Category BEMS
  • Location Vermio