+30 210 60 22 024   |   info@thelcon.gr   |

Newsletter – Spring 2021

We finalized the electromechanical studies for the construction of a Model Bioclimatic Winery, with Zero Energy Consumption (ZEB), in Tinos, in collaboration with Stavropoulou Architects and TechKM.

We have now moved on to the construction of cooling and control systems for the winery’s facilities.

We have undertaken the construction and installation of a BEMS system at the headquarters of NN Insurance on Siggrou Avenue, in collaboration with IOSolutions.

We were commissioned by Elemka S.A. (MYTILINEOS S.A. Group) to install a BEMS system in the new industrial facilities of Intertrade Hellas SA – Softex in Viotia.

For the industrial facilities of Intertrade, we will also integrade the new BEMS system with Thelsoft, our energy monitoring software, for an in-depth energy monitoring and recording.

The aim of the project is to ensure the proper & efficient operation of the industry with the optimal energy efficiency.